archie
THE INVISIBLE INVOICE · CALCULATOR
FOR ARCHITECTURE & ENGINEERING FIRMS

What’s your number?

Set your fees, your team and your rates. Watch the invoice your practice already pays — quietly, every project — add itself up.

YOUR PROJECT
The agreed fee for one complex project.
Design phase, start to handover.
People working on the project, averaged over its life.
What one staff hour costs you, fully loaded (not salary).
Per hour, fully loaded.
The profit you plan on this fee.
Count them: server, e-mail, Teams/chat, Dalux/CDE, Revit/ACC, phone photos, paper… The more scattered, the more hunting and asking.
How many resubmission rounds your last permit went through. US city data: 2–3 cycles are typical for commercial work.
Measured: ~7 h for knowledge workers (McKinsey), 5.5 h in construction (FMI). We default lower.
Projects of this scale your practice runs annually.
YOUR INVISIBLE INVOICE · PER PROJECT
That is of your planned margin on this project.
The hunt
searching for answers that already exist
The echo
seniors re-answering what documents should — scaled by how scattered your information is
The drift
rework on stale information, 5–9% of hours × the 48% data-driven share — research reports more
The late catch
from your correction rounds: 200–450 h redesign per round + resubmission admin
HOURS, NOT NEW SPENDING
project hours your team already works, priced at your own rates
RECOVERABLE WITH ARCHIE
modelled recoverable value, per project
ACROSS YOUR YEAR
RECOVERABLE, PER YEAR

Bring one live project. 45 minutes.

Archie answers your project’s questions with sources, live — no canned demo. Pricing scales with what it recovers: typically under 10% of the invoice Archie wins back on a project.

Book a working session →
archie@archieknows.com

Model (all lines are ranges): hunt = your search hours × team × weeks × staff rate, ±25%, scaled by information scatter (5 places = neutral) · echo = your leads × 2–4 h/week × lead rate, same scaling · drift = 5–9% of project hours as rework × the 48% data-driven share, at staff rate · late catch = your correction rounds × 200–450 h redesign at a blended rate + admin, capped at 6% of fee. Recovery rates (same as the deck): 50% of search time, 40% of interruptions, 40% of data-driven rework, 70% of late findings — the interruptions line is our assumption; no industry statistic exists. Sources: McKinsey Global Institute (2012): knowledge workers spend 19% of the week (~90 min/day) searching and gathering information · FMI/PlanGrid, “Construction Disconnected” (2018, 599 construction leaders — contractor-side): 5.5 h/person/week searching; 48% of US rework from poor data · FMI/Autodesk (2021, 3,900+ professionals): bad data caused ~$88bn of global rework in 2020 · Love (2002) & Burati et al. (1992): total rework ≈12% of contract value, design-induced share largest · Get It Right Initiative (2016): avoidable error 10–25% of project value · US city plan-review records: 2–3 correction cycles typical. The studies date 2012–2022 — every euro figure here is time × the rates you set above.